Proposed Plasterboard Manufacturing Facility at Newport Docks 

Consultation Before Applying for Planning Permission

ABP will shortly be submitting a planning application for a new plasterboard manufacturing facility to be located in Newport Docks.

The proposed plasterboard facility will be located on disused land located south-west of the South Dock.

In advance of submitting the planning application, ABP is undertaking consultation to establish the views of the community and stakeholders within the vicinity of the site of the proposed development.

Should you wish to make any comments on the proposed application please address them to newport@adamshendry.co.uk by 26th February 2020.

The draft planning application documents are provided at the links below:

Air Quality Assessment

ABP New Manufacturing Plant, Newport - Air Quality

Arboricultural Impact Assessment

Newport Docks AIA

Construction Environmental Management Plan

Construction Environmental Management Plan

Ecological Impact Assessment and Ecological Management Plan

Ecological Impact Assessment

Ecological Managament Plan

Flood Consequence Assessment and SuDS Strategy

Flood Consequence Assessment and Sustainable Drainage Strategy

Appendix A - Topographical Survey

Appendix B - Proposed Layout

Appendix C - NRW Flood Information

Appendix D - Drainage Strategy

Appendix E - Surface Water Calculations

Appendix F - Overland Flow Routes

Heritage Impact Assessment

Heritage Impact Statement

Landscape Visual Impact Assessment and Landscape Strategy

Landscape and Visual Impact Appraisal

Illustrative Green Infrastructure Plan

Detailed Planting Strategy 1

Detailed Planting Strategy 2

Noise Impact Assessment

Noise Impact Assessment

Phase 1 Geo Environmental and Geotechnical Desk Study

Phase 1 Geo Environmental and Geotechnical Desk Study 1

Phase 1 Geo Environmental and Geotechnical Desk Study 2

Phase 1 Geo Environmental and Geotechnical Desk Study 3

Phase 1 Geo Environmental and Geotechnical Desk Study 4

Phase 1 Geo Environmental and Geotechnical Desk Study 5

Planning and Design and Access Statement

Planning and Design and Access Statement

Planning Application Form

Newport MF - Completed Application Form

Planning Drawings

Drainage Strategy

Indicative Earthworks Sections

Existing Site Location Plan

Existing and proposed Site Levels

Proposed Site Plan

GA Plan - Level 00

GA Plan - Level 01

Proposed Roof Plan

Proposed Elevations

Proposed Sections

Site Waste and Natural Material Management Plan

Site Waste and Natural Material Management Plan

Transport Assessment

Transport Assessment